Construction works, by quarters and periods
202523.8billion leiMillion lei (in current prices)
vs 2024▲ +33.2 %17.8 → 23.8
Maximum 2016–202523.8billion lei2025
At most 6 series.
Trend over time
The vertical axis starts at zero.
Δ vs the same period
Table of values · million lei
| Period | Value, million lei | Δ vs the same period |
|---|---|---|
| 2025 | 23,764.4 | ▲ +33.2 % |
| 2024 | 17,845.5 | ▲ +7.5 % |
| 2023 | 16,594.3 | ▲ +6.0 % |
| 2022 | 15,650.8 | ▲ +6.6 % |
| 2021 | 14,686.5 | ▲ +6.8 % |
| 2020 | 13,748.3 | ▲ +5.3 % |
| 2019 | 13,058.6 | ▲ +18.1 % |
| 2018 | 11,055.3 | ▲ +23.1 % |
| 2017 | 8,984.2 | ▲ +9.9 % |
| 2016 | 8,177.4 | — |
NBS notes
- Data are elaborated on the circle of entities with the main activity F 'Construction' (CAEM-2), included in the sub-annual survey CONS-TS, in which entities with 4-19 employees are surveyed on a sample basis, and those with 20 employees and more - exhaustively.
- Information is presented without the data on districts from the left side of the river Nistru and municipality Bender.
Primary source of the data: National Bureau of Statistics of the Republic of Moldova#Statistical Survey CONS-TS 'Short-term indicators in construction'
Δ = change against the same period, own calculations based on NBS data.
Source: National Bureau of Statistics of the Republic of Moldova. Statistical databank, table CON010800. License CC BY 4.0.