Construction

Volume of unfinished construction, by economic activities, CAEM, Rev.2

Table codeCON021100FrequencyannualPeriod2013–2016Unitmillion lei
201621.3billion leiTotal · Million lei (current prices)
vs 2015▼ −0.8 %21.4 → 21.3
Maximum 2013–201621.4billion lei2015

Trend over time

The vertical axis starts at zero.

Δ vs the same period

PeriodValue, million leiΔ vs the same period
201621,272.0▼ −0.8 %
201521,448.7▲ +8.6 %
201419,752.6▲ +5.2 %
201318,775.7—

NBS notes

  • Symbols used:
  • 0.0 = magnitude less than 0.05
  • Information is presented without the data on districts from the left side of the river Nistru and municipality Bender
  • As of 2013 the data are presented in accordance with CAEM, Rev. 2 harmonized to NACE, Rev. 2

Primary source of the data: National Bureau of Statistics of the Republic of Moldova

Δ = change against the same period, own calculations based on NBS data.

Source: National Bureau of Statistics of the Republic of Moldova. Statistical databank, table CON021100. License CC BY 4.0.